SG
Sign up Log in

Steel Supervisor

CompetitionNormalDisclosed salaryS$4,000 – S$5,000
Competition
Normal
Disclosed monthly salary
S$4,000 – S$5,000

Job Description

  • Supervise daily steel fabrication and erection activities, ensuring work is carried out according to approved drawings and specifications.
  • Conduct daily toolbox talks and enforce all HSE policies on work sites.
  • Distribute work assignments to foremen, fitters, and welders, monitoring daily progress against production targets.
  • Coordinate with QA/QC inspectors for joint fit-up and weld visual inspections.
  • Ensure dimensional accuracy/requirements are constantly monitored
  • Ensure proper housekeeping and equipment upkeeping in the assigned work areas.
  • Track daily manpower attendance and manage overtime requests.
  • This position is required to be full-time based in Indonesia, Batam.

Requirements

  • Technical certificate or Diploma; welding inspector certifications (e.g., CSWIP) is a plus.
  • At least 5-8 years working experience as a structural/steel supervisor in a shipyard.
  • Basic computer skills for daily reporting and email communication.
  • Able to work in Batam, Indonesia Full time

About Marco Polo Shipyard

Marco Polo Marine Ltd has been listed on the Mainboard of the Singapore Exchange Securities Trading Limited since 2007. The group offers integrated marine logistics across the region, with its work split mainly between shipping and shipyard operations. Its shipping arm charters offshore supply vessels for use in the Gulf of Thailand, Malaysia, Indonesia and Australia, and also hires out tug boats and barges to clients in mining, commodities, construction, infrastructure and land reclamation. The group is setting up a rig division after commissioning PPL Shipyard to build a high-specification Pacific Class 400 rig, which is scheduled for delivery in November 2015. Its shipyard, in Batam, Indonesia, handles shipbuilding as well as ship maintenance, repair, outfitting and conversion work. The site covers about 34 hectares, has roughly 650 metres of seafront and includes three dry docks, allowing it to take on projects involving mid-sized and complex vessels.

Posted 17 Nov 2026